Thank you for taking interest in Crl Components Inc part number CK-104 LONG LEAD, which is listed with the NSN 5910-00-113-5499 and a product description of “Capacitor Fixed Ceramic Dielectr.” In order to receive procurement options on this particular listing, we ask that you fill out and submit the form provided below with as much information as you can concerning your needs. By supplying our staff with key details on your desired quantity, pricing target, and expedited fulfillment timeframe, we can respond with a quote that has been specifically tailored to your unique specifications. We also ask that you make us aware of any restrictions that you may have as soon as possible, such as if you have a time constraint or are seeking unlisted items.
Note : We Will Not Share Your Information To Any Third Parties.
Alongside part number CK-104 LONG LEAD, you are encouraged to continue exploring our collection curated catalogs to find additional items that can accompany this Capacitor Fixed Ceramic Dielectr part with the NSN 5910-00-113-5499. For example, you can browse other Crl Components Inc components that were produced under CAGE Code 71590 or listings that belong to FSC 5910 Capacitors with ease on our website, with search tools provided for quick location. Furthermore, our staff is just a call or email away from assisting you with any inquiries or requests, so be sure to get started on the quotation process for part number CK-104 LONG LEAD and other desired offerings on Aerospace Spare.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
300-100-610-104Z | 3 | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
If You’re Ever Looking for NSN parts Or Have an Aircraft On Ground Situation, Don’t forget That We offer Competitive Pricing and Guaranteed On-Time Delivery.
Request for Quote